Production proof / 02
Finished-product inspection
After batch production, verify finished dimensions, groove layout, groove condition and fit-check requirements.
View inspection priorities
Inspection priorities
Inspection confirms readiness for drawing-based delivery.
A slatwall project cannot be approved by surface color alone.Inspection points should match the project drawing and approved sample, especially finished dimensions, groove relationships and aluminum trim fit.
- finished dimensionsVerify finished length, width, thickness and the actual dimensions after trimming.
- Groove layoutCheck whether groove spacing, orientation and edge positions match the approved information.
- Groove opening and fit checkCheck the groove opening and confirm aluminum trim fit against the project requirements.
- Surface and edgesCheck the finish, edge treatment and protection before handling.
Verification logic
Drawing, finished part and fit check should follow one standard.
Groove width and spacing should be judged together with the aluminum trim profile and project conditions.The checks on this page describe the review process; the order drawing and approved sample remain the final reference.
Compare with the drawing
Confirm dimensions, groove positions, orientation and edge allowance.
Inspect the finished part
Review the groove openings, finish, edge treatment and overall condition.
Confirm the fit check
When aluminum trim is required, use the fit-check result as the release basis.
Put the inspection standard into the project information.
Send the drawing, sample requirements and acceptance points for confirmation before quotation.